The port operator
for general cargo

Since 1992 in the Port of Constanța. Own terminal, zero-emission electric crane, 5,000 t / 24h capacity and vessels up to 20,000 dwt.

24/7 operations at berth RO-RO 4
5.000t / 24hHandling capacity
20.000tdwVessels at berth
25.000mpCovered storage + yard
0kgCO₂ emissions · electric crane
The ROTRAC terminal

Berth RO-RO 4.
Own resources.

We operate berth RO-RO 4 inside the Port of Constanța with our own equipment and specialised staff. The infrastructure complements the type of operation you choose.

Electric quay crane (2025)zero CO₂ · EU 2016/1628
Bocșa quay cranes4 × 6.2 tf
Telemac / KC mobile cranes12.5 · 25 tf
Forklifts Nissan · Daewoo · GS · Hyundai3 – 7 t
Tractors with trailer · trailers20 t · 5/7 t
Trucks24 – 26 t
Storage5,000 · 20,000 · 2,000 sqm
Terminal fact sheet (PDF)
Vessel schedule

Line-up at berth RO-RO 4.

Updated 14.10.2026 15:44 · Source: ROTRAC dispatch
VesselCargoTonnageETA / ETBETDStatus
M/V [NAVA 1] Rebars · coils 6.400 t 14.10 · 06:00 16.10 · 18:00 Operating
M/V [NAVA 2] Colemanite (barge) 3.200 t 16.10 · 20:00 18.10 · 08:00 Expected
M/V [NAVA 3] Long steel products 9.800 t 19.10 · 10:00 22.10 · 14:00 Scheduled
Swipe the table sideways for all columns.
EU projects · TP 2021–2027

A new electric crane.
Capacity ×3.

Project SMIS 329367, co-financed by the Cohesion Fund. Completed 30.09.2025. Vessels up to 20,000 dwt and zero CO₂ emissions in loading-discharging operations.

5.000t / 24h (from 1,500)
550kt / year operable
0CO₂ emissions
About the project
Electric crane · in operation SMIS 329367
Company

Professionalism
since 1992.

One of the oldest port operators in Constanța. We started with impressive volumes of timber; today we focus on handling and storing general cargo on our own premises, with a modernisation budget and majority shareholders accelerating development.

1992

ROTRAC S.A. founded

Debut in the Port of Constanța, noted for the timber volumes handled.

2000s

General cargo, own premises

Focus on handling and storage; operation of berth RO-RO 4.

2024

New majority shareholders

Modernisation budget, wider service range and client portfolio.

2025

Electric crane · EU project

Capacity tripled, vessels up to 20,000 dwt, zero CO₂.

MissionMinimum handling time, maximum standardWe optimise the time / quality ratio of operations, with professionalism as the rule.
Safety & qualityHSSE on the quay, 24/7Permanent video surveillance, operating procedures, ergonomic equipment.
EnvironmentGreen technology, EU standards100% electric crane, waste management, public environmental reporting.Environmental documents
Let's talk

The ROTRAC team is at your disposal.

We reply within the same working day. 24/7 operations, on-quay assistance.